- Built to order
- Free site layout
- Same-day proposals
Plow-proofShownFlush at a gated-community exit1 / 12In-GroundTraffic Spikes
Invisible to plows. Impossible to ignore.
Set flush in a concrete pad, so plows, sweepers and right-way traffic glide over. Come in the wrong way and sharpened steel is waiting.
- Load capacity
- 40TonLoad capacity
- Sharpened steel blades
- 3/8InSharpened steel blades
- Plows ride right over
- FlushPlows ride right over
Build your system
Takes about 30 seconds01How many exit lanes?
1 lane02How wide is each lane?
12 ft per lane03Blade style
Sharpened04Winters where you are?
Mild


Your system
12 ft · 3 sections
1 exit lane · sharpened blades · standard frame
Drain-ready frame and anchors included
A specialist sends a drawn layout and proposal, usually the same business day. No obligation.
Rather talk it through? 855-526-9683
Free
Site layout
2-Year
Warranty
Turnkey
Install available
Guarding the exits of people who can’t afford a wrong-way driver.
Logistics yards, military gates, theme parks, airports and apartment communities.
2005
Family-owned
Still answering our own phones.
40Ton
Load capacity
Loaded trucks included.
3/8In
Steel blades
Sharpened, counterweighted, no springs.
2Min
Lockdown
Latch every blade flat for events.

How it works/ 01
Level with the road. Ruthless in reverse.
Each blade is counterweighted, not spring-loaded. Right-way tires press it down into the frame, and the weight swings it back up the moment they pass. Come in the wrong way and the blade doesn't budge.
- 01
Roll out
Tires press each blade down into the frame. At exit-lane speed, drivers barely feel it.
- 02
Swing back
Counterweights return every blade upright. No springs to wear out.
- 03
Stop cold
Wrong-way tires meet steel that won't fold. Signs on both sides make sure nobody can say they didn't know.
Built for/ 02
Built for places
that don't move.
In-ground systems are for exits you'll guard for the next decade: secure gates, public lots and anywhere a snowplow drives.
Most requested01Military & government gatesPermanent one-way control at base exits and checkpoints.Build for this site →
02Airports & secure facilitiesFlush at the gate arm, so service vehicles and plows pass clean.Build for this site →
03Ports of entryLane discipline where the stakes are highest.Build for this site →
04Snow countryPlows ride right over. Add heat trace and it never freezes up.Build for this site →
Reviews/ 03
Excellent
4.9 out of 5 from 137 verified reviews

Winter-proof/ 04
Plows ride right over.
The cover plate sits flush with the pavement, so plows, sweepers and street-cleaners never catch an edge.
- Flush with gradeNothing for a plow blade to catch.
- Heat-trace optionKeeps blades free in ice storms.
- Built-in drainageDrain holes in every section.
- Two-minute lockdownLatch every blade flat for events.
Specifications/ 05
The fine print, in bold.
Everything your engineer, concrete contractor and facilities team will ask for.

- Sections
- 38 in or 48 in, join end to end
- Cover plate
- 3/8 in plate steel, polyurethane-coated
- Blades
- 3/8 in sharpened steel, safety yellow (stainless available)
- Blade height
- Adjustable, 2.5 to 4 in
- Capacity
- 40 tons
- Mechanism
- Counterbalanced. No springs required
- Lockdown
- Latches every blade flat; lock-up available
- Max speed
- 10 mph recommended
- Installation
- Void form, pre-poured pad or drop-in
- Cold climates
- Heat-trace cable option
- Warranty
- 2 years
Installation/ 06
Poured once.
Guarding for years.
Building new? We set the frame in your pour. Retrofitting? We saw-cut the lane and pour a fresh pad around it.
- Day 1
Cut & trench
Saw-cut the lane and dig a trench about 24 in wide.
- Day 2
Set & pour
Level the frame, connect the drain and pour the pad.
- Day 3
Drop in & bolt
Set each section, bolt it down and open the lane.

Compare/ 07
Is in-ground worth the concrete?
If the lane is permanent and plows come through, yes. Here's the honest side-by-side.
| In-groundYou're here | Surface-mountedView → | MotorizedView → | |
|---|---|---|---|
| Install | Set flush in a concrete pad | Bolts on top | On or in the pavement, plus power |
| Time to install | 2–3 days | About a day | 2–5 days |
| Two-way traffic | No | No | Yes, on command |
| Snowplows | Plow right over | Lift out for winter | Depends on mount |
| Best for | A permanent, flush look | Fast, affordable exits | Lanes that switch direction |
FAQ/ 08
Questions we hear every week.
Didn't see yours? Ask someone who installs these for a living.
855-526-9683
Real people. Real expertise.
Talk to
someone who
actually knows.
No scripts, no call-center runaround. Send us a photo of your lane and we'll tell you exactly what the pour takes.
- Live U.S. support
- Spec help & drawings
- TURNKEY INSTALL
















